SAP Signavio SOC 2 Bridge Letter Package

SAP Signavio regularly provides a bridge letter for the SAP Signavio SOC 2 report.  Bridge letters are intended to cover the gap between the end date of the referenced report and the issue date of the bridge letter. This bridge letter package covers the period April 1st, 2025, to October 31st, 2025.