SAP Fieldglass SOC 1 Bridge Letter Package

SAP Fieldglass regularly provides a bridge letter for the SAP Fieldglass SOC 1 report.  Bridge letters are intended to cover the gap between the end date of the referenced report and the issue date of the bridge letter. This bridge letter  covers the period of April 1, 2026 to May 31, 2026.