Taking Plant Maintenance Beyond with Visual Planner
Visual Planner is an innovative solution that allows asset-intensive organizations to implement a most efficient Work Week Management process, ensuring routine maintenance work is always performed on-time, in order to achieve highest level of equipment reliability while minimizing maintenance costs. Visual Planner integrates seamlessly with your SAP ERP plant maintenance module data: maintenance plans, work orders, etc. A Visual Planner implementation project typically pays for itself in two months.
By Beyond Technologies Consulting Inc.
Overview
Optimize maintenance schedules
Visual Planner for SAP allows companies in the industrial sector to implement a solid Work Week Management Process for achieving maintenance excellence.
Increase asset lifetime
Visual Planner prevents equipment failure thanks to preventive maintenance.
Enhance resource workloads
Our solution allows SAP Plant Maintenance users rigorously monitor compliance per week on the work done.
Details
Solution type
Extensions and Add-ons
Industry
Cross-Industry
Compatibility
Works with
Features
Visual PM
Perform long term capacity planning and PM workload levelling, which is the foundation for controlling your maintenance work backlog. With Visual PM, you will ensure that you will have the resources required to execute preventive maintenance work and inspections on time, in compliance with your reliability program’s requirements.
Visual Scheduler
Efficiently manage a multi-week scheduling process. Schedulers can visualize and select the work required to be completed each week in order to prevent equipment failures, according to the plant’s priorities and availability of the resources required to execute the work on time. Visual Scheduler is designed from the ground up to support the Work Week Management process. It provides visibility and control of multi-week schedules that neither project scheduling software, nor scheduling spreadsheets can achieve since they were not designed in the first place to manage the multi-week scheduling process.
Visual Assignment
Allows supervisors to overcome the multitude of daily challenges to completing jobs on time and achieve the highest level of schedule compliance. Graphically assign crews in the quickest and easiest manner. Minimize the time spent on your computer and maximize the time spent with your crew.