Demo Script for SAP S/4HANA 2023 (FPS03/02/01) Fully-Activated Appliance: Plan to Produce using Advanced Planning for Capacity Utilization
© 2024 SAP SE or an SAP affiliate company. All rights reserved. See Legal Notice on www.sap.com/legal-notice for use terms, disclaimers, disclosures, or restrictions related to this material.
PUBLIC
SAP S/4HANA 2023 FPS03/02/01 Fully-Activated Appliance
April 2025
Demo Guide:
Plan to Produce Using Advanced Planning for Capacity
Utilization
PUBLIC
SAP S/4HANA 2023 FPS03/02/01 Fully-Activated Appliance
April 2025
Demo Guide:
Plan to Produce Using Advanced Planning for Capacity
Utilization
Table of Contents
1 Where Can This Script Be Used? 3
1.1 Passwords for the pre-configured demo users 3
2 Demo Story: Plan to Produce Using Advanced Planning for Capacity Utilization 4
2.1 Preliminary Steps 4
2.1.1 Post Initial Stock 4
2.1.2 Check Stock Level 6
2.2 Create Planned Independent Requirements 7
2.3 Run Material Requirement Planning 8
2.4 Monitor Capacity Utilization 10
2.5 Create Production Order for Semifinished Product 22
2.6 Release Production Order for Semifinished Product 23
2.7 Confirm Production Order for Semifinished Product 24
2.8 Post Goods Receipt for Semifinished Production Order 26
2.9 Manage Inspection Lot 27
2.10 Create Production Order for the Finished Good 29
2.11 Release Finished Goods Order 30
2.12 Confirm Production for Finished Product 31
2.13 Post Goods Receipt for Production Order 33
Document History
Revision Date Change
1.0 <2020-06-02> Release for customer for S/4HANA 1909 FPS02
2.0 <2021-04-15> Release for customer for S/4HANA 2020 FPS01
2.1 <2021-07-08> Release for customer for S/4HANA 2020 FPS02
2.2 <2022-03-31> Release for customer for S/4HANA 2021 FPS01
2.3 <2022-06-28> Release for customer for S/4HANA 2021 FPS02
2.4 <2022-12-06> Release for customer for S/4HANA 2022 FPS00
2.5 <2023-06-06> Release for customer for S/4HANA 2023 FPS02
2.6 <2023-10-24> Release for customer for S/4HANA 2023 SP00
2.7 <2024-03-24> Release for customer for S/4HANA 2023 FPS01
2.8 <2024-11-01> Release for customer for S/4HANA 2023 FPS02
2.9 <2025-04-01> Release for customer for S/4HANA 2023 FPS03
1 Where Can This Script Be Used? 3
1.1 Passwords for the pre-configured demo users 3
2 Demo Story: Plan to Produce Using Advanced Planning for Capacity Utilization 4
2.1 Preliminary Steps 4
2.1.1 Post Initial Stock 4
2.1.2 Check Stock Level 6
2.2 Create Planned Independent Requirements 7
2.3 Run Material Requirement Planning 8
2.4 Monitor Capacity Utilization 10
2.5 Create Production Order for Semifinished Product 22
2.6 Release Production Order for Semifinished Product 23
2.7 Confirm Production Order for Semifinished Product 24
2.8 Post Goods Receipt for Semifinished Production Order 26
2.9 Manage Inspection Lot 27
2.10 Create Production Order for the Finished Good 29
2.11 Release Finished Goods Order 30
2.12 Confirm Production for Finished Product 31
2.13 Post Goods Receipt for Production Order 33
Document History
Revision Date Change
1.0 <2020-06-02> Release for customer for S/4HANA 1909 FPS02
2.0 <2021-04-15> Release for customer for S/4HANA 2020 FPS01
2.1 <2021-07-08> Release for customer for S/4HANA 2020 FPS02
2.2 <2022-03-31> Release for customer for S/4HANA 2021 FPS01
2.3 <2022-06-28> Release for customer for S/4HANA 2021 FPS02
2.4 <2022-12-06> Release for customer for S/4HANA 2022 FPS00
2.5 <2023-06-06> Release for customer for S/4HANA 2023 FPS02
2.6 <2023-10-24> Release for customer for S/4HANA 2023 SP00
2.7 <2024-03-24> Release for customer for S/4HANA 2023 FPS01
2.8 <2024-11-01> Release for customer for S/4HANA 2023 FPS02
2.9 <2025-04-01> Release for customer for S/4HANA 2023 FPS03
© 2024 SAP SE or an SAP affiliate company. All rights reserved. See Legal Notice on www.sap.com/legal-notice for use terms, disclaimers, disclosures, or restrictions related to this material.
3
1 Where Can This Script Be Used?
This demo script has been written for usage with the SAP S/4HANA 2023 FPS03 Fully-Activated Appliance (in short “appliance” in
this script), hence you will need such an appliance to make use of this guide.
The appliance can be brought up in two ways, and the demo scenario in this script is largely the same for both:
1. Via SAP Cloud Appliance Library (hosted on cloud providers)
You need a cloud provider account at AWS, MS Azure, or GCP. With this, you can deploy the appliance within 1-2 hours from
https://cal.sap.com > Solutions > SAP S/4HANA <Your Release> Fully-Activated Appliance.
2. Via installing it on your own on-premise hardware.
You need to provide your own hardware, and order & install the appliance as explained in SAP Note 2041140.
If you are new to the SAP S/4HANA Fully-Activated Appliance, introductory information can be found here:
https://blogs.sap.com/2018/12/12/sap-s4hana-fully-activated-appliance-create-your-sap-s4hana-1909-system-in-a-fraction-of-
the-usual-setup-time/
Important:
Before you start your demo, please read SAP S/4HANA Fully-Activated Appliance: Demo Scripts for information about necessary
preparations, especially any post-deployment steps to ensure the full functionality of your appliance. These steps are covered in
sections;
B) General Remarks
C) Post-deployment Steps
D) Log-on to the system
Besides this, you will also find links to all demo scripts on this page.
1.1 Passwords for the pre-configured demo users
Please contact your company’s system administrator for your company-specific demo user passwords. Demo users provided in
the appliance which are used for the Demo Scripts were delivered with the password “Welcome1”, however SAP recommends
changing these.
If you experience user/logon issues, please contact your team’s SAP S/4HANA Appliance system administrator.
3
1 Where Can This Script Be Used?
This demo script has been written for usage with the SAP S/4HANA 2023 FPS03 Fully-Activated Appliance (in short “appliance” in
this script), hence you will need such an appliance to make use of this guide.
The appliance can be brought up in two ways, and the demo scenario in this script is largely the same for both:
1. Via SAP Cloud Appliance Library (hosted on cloud providers)
You need a cloud provider account at AWS, MS Azure, or GCP. With this, you can deploy the appliance within 1-2 hours from
https://cal.sap.com > Solutions > SAP S/4HANA <Your Release> Fully-Activated Appliance.
2. Via installing it on your own on-premise hardware.
You need to provide your own hardware, and order & install the appliance as explained in SAP Note 2041140.
If you are new to the SAP S/4HANA Fully-Activated Appliance, introductory information can be found here:
https://blogs.sap.com/2018/12/12/sap-s4hana-fully-activated-appliance-create-your-sap-s4hana-1909-system-in-a-fraction-of-
the-usual-setup-time/
Important:
Before you start your demo, please read SAP S/4HANA Fully-Activated Appliance: Demo Scripts for information about necessary
preparations, especially any post-deployment steps to ensure the full functionality of your appliance. These steps are covered in
sections;
B) General Remarks
C) Post-deployment Steps
D) Log-on to the system
Besides this, you will also find links to all demo scripts on this page.
1.1 Passwords for the pre-configured demo users
Please contact your company’s system administrator for your company-specific demo user passwords. Demo users provided in
the appliance which are used for the Demo Scripts were delivered with the password “Welcome1”, however SAP recommends
changing these.
If you experience user/logon issues, please contact your team’s SAP S/4HANA Appliance system administrator.