Integration of Work Status with Activities of the Business Process Flow in BPC: An Example-Based How-To Guide
Customers using "SAP BPC optimized for S/4HANA Finance" (fka "Integrated Business Planning - IBPF") for financial planning want to control the planning process by a guided work flow. This How-To Guide describes the use of Business Process Flow (BPF) from BPC and the combined synchronized use of BPF and Work Status (WS) within the embedded (BPC). Download the Document