Clean core extensibility for SAP S/4HANA Cloud

Learn how the clean core strategy and the extensibility model described in this paper support this objective: Enabling customers of SAP S/4HANA Cloud to extend where needed, but still allowing for smooth system upgrades and handling of system extensions. Stáhnout dokument

Creating scalable, upgrade-readyextensions for the AutonomousEnterpriseWHITE PAPERClean core extensibility
Table of contentsPreface: Autonomous Enterprise 3and clean coreExecutive summary 51 Introduction 72 Why a clean core is important 92.1 Overcoming obstacles andunlocking innovation 93 What a clean core means for 10extensibility3.1 Extensibility as part of the 5 guiding 10principles of clean core3.2 Extensibility options: On-stack 11and side-by-side3.2.1 On-stack: SAP Build (through ABAP 12Cloud) or classic extensibility3.2.2 Side-by-side with SAP Build 14and Joule Studio3.2.3 The best of both worlds: on-stack 17and side-by-side extensions3.3 SAP’s clean core extensibility model 19and the clean core level concept3.3.1 The clean core level concept 193.3.2 Evolution of 3-tier extensibility 20to level concept3.3.3 Overview of clean core levels 213.3.4 Why, what and how—Under- 22standing the new clean core levels3.4 Partner add-ons and clean core 263.4.1 SAP Solution Extensions 263.4.2 Clean core APIs from partners 264 How to achieve a clean core 27for extensibility?4.1 RISE with SAP Methodology 274.1.1 Governance and maturity— 28An approach to assessingclean core governance4.1.2 Clean core measurement 29framework4.1.3 Measurability: Extensibility KPIs 304.2 Reaching clean core with“Stay Clean” and “Get Clean” 334.3 Stay Clean: How to create 34clean extensions4.3.1 Functional requirements 344.3.2 Extension architecture 384.3.3 Extension implementation 404.3.4 Extension deployment 424.4 Get Clean: How to measure the 44current state of clean core?4.4.1 RISE with SAP Methodology 44dashboard4.4.2 Assessing clean core KPIs 45individually4.5 How to achieve a clean core 464.5.1 Key steps and recommendations 47for your path to clean core5 F.A.Q. 496 Appendix 502 | 53Clean core extensibility