Create a Custom Data Model for a Work breakdown structure (WBS)

This How To Guide describes the solution to create a custom flex data model for WBS. The reuse mode, which can be also used if the tables already exists in SAP S/4HANA, is not used in the guide. For simplicity reasons, the guide only describes using flex mode and does not include how to push the staging data to the backend tables.
https://d.dam.sap.com/x/St8iV6z?doi=SAP932441